Develop · 04 / 04
Technical SEO
Typical timeline
1–2 weeks
Engagement
Audit, then fixes
Team
2 senior specialists
Best for
MigrationsCore Web VitalsCrawl issues

+ Proof 01 · Technical SEO in production
01 / The point of view
Rankings aren’t won with blog posts bolted onto a slow site. We engineer crawlability, schema, and Core Web Vitals into the build itself, so launches gain positions instead of gambling them.
02 / What’s included

+ Fig. 01 · Where the work happens
03 / The numbers we defend on calls
median mobile load time across recent launches
median Lighthouse performance score at handover
average organic traffic, six months post-launch
+ Selected frames



Crawl
Full technical crawl: indexing, speed, structure, mobile, and what Google actually sees.
+ Prioritised findings
Fixes
The issues that move rankings, fixed — not a list handed back to you.
+ Fixes shipped, not just reported
Proof
Before-and-after numbers, and the monitoring that keeps it honest.
+ Report + Search Console setup

+ Fig. 02 · The work in progress
04 / How we run it
Performance budgets set before a line of code. Design and engineering in the same room from day one. You own the code, the CMS, and the pipeline outright. No lock-in.
05 / The engagement shape
A marketing site runs 4–8 weeks, a Shopify store 3–6, a full commerce build 6–10, an SEO audit 1–2. Every one opens with a paid discovery week that fixes scope and budget before a line of code.
06 / Applied in the work
View Project
View Project“ Clients bring the site up on the first call now. A year ago we were the ones apologizing for it. It carries the studio’s standard before we say a word, and briefs arrive better formed because of it. ”
Salma Idrissi · Co-founder, Medina Studio
07 / Straight answers
The questions that stall sign-off, answered before the first call.
Integrations and content volume move the number, not page count — we fix both up front, so the estimate you sign is the invoice you get.
08 / Also in Develop
Sound like your kind of team?
Start a projectNo decks. A first direction on the table within two weeks.
Next · AI Studio
